C |
ONTROLLED
PRECISION MANUFACTURING, INC.
****************************************************
THE BODY OF THE
MANUEL WILL BE LINKED UPON REQUEST WHEN COMPLETED…
However it is
currently under construction and revision to SAE AS 9100.
CONTROLLED PRECISION
MANUFACTURING, INC
QUALITY
CONTROL MANUAL
APPROVED
BY
Shirley Hamilton
PRESIDENT
Shirley Hamilton
QUALITY
ASSURANCE MANAGER
EFFECTIVE DATE: 1/3/83
REVISION: AG
REVISED DATE: 2/21/02
ASSIGNED TO:
COPY NUMBER:
A Update
Q.C. Manual to meet Boeing requirements 2/17/84
B UPDATE REVIEW
3/15/85
C Inclusion of Paragraph 3.6.2.5
Defective Equipment. Change
9/13/85
Paragraph
3.6.2.5 to 3.6.2.6.
D UPDATE REVIEW 3/20/86
E Revised entire Manual 10/10/86
F Change existing 3.6.6 Stamp
Control to 3.6.7 and add 3.6.6 4/15/87
Control
of Material or Articles With a Limited Storage Life
or Requiring Environmental Control.
G Revised Section 3.6.2 F and Section 3.6.7 E 9/23/87
H UPDATE REVIEW 10/9/87
I UPDATE REVIEW 10/10/88
J Revised Section
3.1.6, added new Section 3.6.7 E and F. 1/3/89
Revised Fig. IX.
K UPDATE REVIEW 10/17/89
L UPDATE REVIEW 10/5/90
M Revised Section 3.6.7 for new
stamps 12/4/90
N Revised Section
3.6.3 B Tool Storage Card Fig. XIII 8/8/91
O UPDATE REVIEW 10/9/91
P UPDATE REVIEW 10/8/92
Q Revised Section 2.1 Organization
Chart Revised Section 1/6/93
2.2
Q.C. Organization Chart
R UPDATE REVIEW 10/19/93
Revised
Section 3.5.3 A added planning required for any
rework. Revised Section 3.5.3 D added planning required
for any repair.
Added Section 3.5.5 Noted compliance with
Mil-Std-1520. Revised Section 3.6 Changed name of NIST
Revised
Section 3.6.2 B added minimum accuracy, changed
name of NIST.
Revised Section 3.6.2 E Schedule of
Calibration
from 30 days to 90 days.
S Revised Section 3.6.4 A, B, and C
Control of Customer 5/12/94
Production
Drawings, Planning, Specifications and other
related
documents
T UPDATE REVIEW 10/12/94
U Revised Section 3.4.1 G to
include phrase for customer 9/6/95
returned
parts. Section 3.4.3 C change to
OIS. Add
Section
3.5.6 to include analytical control of rejected
parts. Section 3.5.1 expanded defective parts to include
all rejected items.
V UPDATE REVIEW 10/10/95
W Revised Section 3.5 Material
Review and Corrective 3/26/96
Procedures
X UPDATE REVIEW
11/6/96
Revised Section 3.1.6 to test
first material purchased
from each
vendor. Revised 3.3.6 changes
Mil-Q-9858A
to
Mil-I-45208A. Split off 3.4.1 D from
3.4. 1C. Added
Section
3.4.1 E. Revised Section 3.4.1 F. Changed 3.4.1
D, E, F and G to F, G, H, and
I. Revised 3.4.2 G
reference made to control limits.
Revised 3.4.4 B added
temper. Added3.5.2 B d retained scrap impression
stamped, discarded destroyed.
Revised 3.6.2 I attach
label where practical.
Y Add Section 1 Boeing D1-9000
requirements. Moved 3/3/97
Section 1.1 to 2.1.1,
Section 1.2 to 2.1.2, Section 1.3 to 2.1.3,
2.1 to 2.2, 2.2 to 2.3 and 2.3 to 2.4. Revised Sections 2.3.3
add SPC and 2.3.4 add
training log. Add Sections 2.3.6
suitable environment, 3.2.3 FAI in master file, and 3.2.4
FAI updated. Revised Section 3.3.2 add customer list, and
3.3.3 add master spec list.
Add Section 3.4.1E traceablity.
Revised 3.4.2A contract review and shop status. Add Section
3.4.2D interchangeable and replaceable and 3.4.2K SPC.
Add Section 3.5.2B CLS and Rejected Parts Tracking.
Revised Sections 3.5.2Cb hold point notice issued and
3.5.2Cc repetitive nonconformance. Added Section 3.5.2Cd
nonconformity
notification. Revised Sections 3.5.2Ch corrective
action format, 3.6.2G new gage
calibration, 3.6.3B Tool Record
Card changed to Tool Stores List
and 3.6.4A add Drawing
Check Out Log. Added Section 3.6.5E finished parts stores
log.
Revised Section 3.6.7E lost
stamps permanently removed from
service. Add Section 4, which was under separate
cover.
Z UPDATE
REVIEW 10/31/97
Section 2.2 and 2.3 Personnel Revised.
Section 3.6.2E and
Fig
X Calibration Schedule changed.
AA UPDATE
REVIEW 10/31/98
AB
UPDATE REVIEW
10/31/99
AC
Revised 3.6.1 and 3.6.2 to meet requirements of ANSI/
NCSL Z540-1 and changed D1-9000 to ISO 9000 2/15/00
AD
Incorporated ADDENDUM A & B.
Revised ADDENDUM B
to meet requirements of QA111
ADDENDUM J. Added
Exhibit A Current Facilities
List
4/15/00
AE UPDATE
REVIEW 10/31/00
AF UPDATE
REVIEW
Adjust minor discrepancies between
Table of Contents and text 10/31/01
AG Revised
Schedule of Audits and Logs. Revised
3.6.1 & 3.6.2, changed
calibration interval, added authority to temporarily extend due date.
Added
30 day review to procedure changes 2.1.3 and defined not in
calibration system, reference only 3.6.2 2/21/02
CONTROLLED
PRECISION MANUFACTURING QUALITY POLICY
CPMi is committed to a policy of continuous
permanent improvement in the quality of our products and processes. To fulfill this commitment sufficient
resources will be committed to establish and maintain an effective and
economical quality system which will insure the fabrication of quality products
beyond the expectations and needs of our customers.
The quality control manager is given the full
responsibility to ensure that such quality system is established, implemented
and maintained at all level of the organization.
It will be the responsibility of each department
manager to insure that each employee within his department is given the tools and
time necessary to become proficient in performing their jobs within the
established quality system.
It shall be the responsibility of each individual
employee to be knowledgeable in the quality system as it pertains to their job
and to operate within that system.
Only with the total commitment to quality of each
individual as part of a solidified team will we be able to achieve the
necessary elements to securing and maintaining complete customer satisfaction.
William
H. Hamilton III
President
March
3, 1997
1. CPMi REQUIREMENTS
1.1
Management Responsibility
1.1.1 Quality policy
1.1.2 Organization
1.1.3 Management Review
1.2 Quality
System
1.2.1 General
1.2.2 Quality System Procedure
1.2.3 Quality Planning
1.3 Contract Review
1.3.1 General
1.3.2 Review
1.3.3 Amendment to a Contract
1.3.4 Records
Fred-Shop Foreman with CPMI since
4/94 1.4 Design Control
1.4.1 Design Authority
1.5
Document and Data Control
1.5.1 General
1.5.2 Document and Data Approval and Issue
1.5.3 Document and Data Changes
1.6
Purchasing
1.6.1 General
1.6.2 Evaluation of Subcontractors
1.6.3 Purchasing Data
1.6.4 Verification of Purchased Product
1.6.5 Requirements of
Flowdown

1.7 Control of Customer-Supplied Product
1.7.1 Notification and Authorization
1.8 Product Identification and Traceabilty
1.9 Process Control
1.9.1 Process
Specifications and Requirements
1.9.2 Tooling
1.10 Inspection and Testing
1.10.1 General
1.10.2 Receiving Inspection and Testing
1.10.3 In-Process Inspection and Testing
1.10.4 Final Inspection and Testing
Pat-QC Tech with CPMi since 2/97 1.10.5 Inspection and Test
Records
1.10.6 Inspection Options
1.11 Control of Inspection Measuring and Test
Equipment
1.11.1 General
1.11.2 Control Procedure
1.12 Inspection and Test Status
1.12.1 Inspection Stamps
1.13 Control of
Nonconforming Product
1.13.1 General
1.13.2 Review and Disposition of Nonconforming Product
1.14 Corrective and Preventive Action
1.14.1 General
1.14.2 Corrective Action
1.14.3 Preventive Action
1.15 Handling Storage, Packaging, Preservation and Delivery
1.15.1 General
1.15.2 Handling
1.15.3 Storage
1.15.4 Packaging
1.15.5 Preservation
1.15.6 Delivery
1.16 Control of Quality Records
1.16.1 Record Retention and Availability
Larry-Hand
Finisher/Stock Router
With CPMI since 2/95 1.17 Internal
Quality Audits
1.17.1 Annual Audits
1.18 Training
1.18.1 Proficiency Assessment
1.19
Servicing
1.20 Statistical Techniques
1.20.1 Identification of Need
1.20.2 Procedures
1.20.3
Acceptance Sampling
1.20.4 Management Responsibility
1.20.5 Quality System
1.20.6
Corrective and Preventive Action
1.20.7 Internal Quality Audits
1.20.8 Training
1.20.9 Measures of Defect and Waste
1.21 Determine Key Characteristics
1.21.1 Does Customer Provide Key Characteristics?
1.21.2 Collect Data to Determine Key Characteristics
1.21.3 Establish Key Characteristics
1.21.4 Document Key Characteristics and Engineering
Specifications on AQS Control Plan
1.22 Provide Evidence of Variation
1.22.1 Determine Process Steps Where Key
Characteristics
are Measured
1.22.2 Select Appropriate Control Charts
1.22.3 Document Process Steps, Control Charts, Sample
Size, and Frequency on AQS Control Plan
1.22.4 Collect Measurements and Maintain Control Charts
Don-Machinist with CPMi since 2/97
1.23 Identify and Control Sources of
Variation
1.23.1 Is Key Characteristics in Statistical Control?
1.23.2 Does Key Characteristics Meet Minimum Capability?
1.23.3 Can Special Causes of Variation Be Assigned ?
1.23.4 Remove Special Causes of Variation
1.23.5 Collect New Measurements
1.23.6 Perform Gage Variation Study and Document Results
on AQS Control Plan
1.23.7 Was Corrective Action Take on Measurement
System ?
1.23.8 Identify Potential Sources of Process Variation
1.23.9 Correlate Sources of Process Variations With the
Key
Characteristic
1.23.10 Establish Controls for Key Process Parameters
1.23.11 Document Operations, Key
Process Parameters,
Process Parameter Settings, and Control Method
on AQS Control Plan
2. COMPANY ORGANIZATION, MANAGEMENT AND
TRAINING
PROGRAM

2.1 Introduction
2.1.1 Purpose
2.1.2 Scope
2.1.3 Distribution and Revision
2.2 CPMi Organization Chart
2.3 CPMi Quality Assurance Organization Chart
CPMi location since 1983
2.4 Training of Personnel
3. QUALITY CONTROL FUNCTIONS AND PROCEDURES
3.1
Audit of Quality Control System and Support
3.2
Records-Quality Control Forms and Retention
3.3 Control
of Purchased Material and Processes
3.4
Inspection Procedures
3.4.1
Receiving Inspection
3.4.2 In Process Inspection/First Article Inspection
3.4.3 Final Inspection
3.4.4 Shipping Inspection
3.5 Material Review Board Procedures,
Corrective and Preventative
Action
3.6 Control Procedures
3.6.1 Inspection Department Control of Precision
Measuring Tools
3.6.2 Calibration Procedures
3.6.3 Control of Production Tools
John-Machinist with CPMi since10/98 3.6.4 Control of Customer
Production Drawings, Planning
Specifications
and Other Related Documents
3.6.5 Control of Production Stores
3.6.6 Control of Material
or Articles With a Limited
Storage Life or Requiring Environmental Control
3.6.7 Stamp Control
4. STATISTICAL PROCESS CONTROL
4.1
Policy/Scope
4.1.1 General Policy for Application
4.1.2 Specific Goals
4.1.3 Commitments
4.2 SPC Structure
4.2.1 Department Ownership
4.2.2 Department Responsibilities
4.3 Training
4.3.1 Provide Training
4.3.2 Qualification
4.3.3 Re-qualification
4.4 Dominant Characteristics
4.5 Statistical Methods
4.5.1 Types of Control Charts
4.5.2 Other Statistical Methods
4.5.3 Criteria for Out of Control
4.6 Process Capability
4.7 Corrective Action Plan
4.7.1 Improve Process
4.7.2 Identify Causes
4.7.3 Corrective Action
Billy
Bob with CPMi since 4/99 4.8 Immediate Corrective Action
ADDENDUM A ACCIDENT/ILLNESS PREVENTION
PLAN
ADDENDUM B CAD/CAM PROCESS CONTROL PLAN
EXHIBIT A CURRENT FACILITIES LIST
REMEMBER:
When
Performance Counts, Only Quality Performs!